Working Process:
1.       Built the buildings foundation
2.       Transport the finished arch panel to construction site
3.       Jointing the arch panel together
4.       Hoisting and fastening the jointed arch panels
5.       Reinforce arch panel and foundation together
6.       Built the gable of two sides.
7.       Built the door and window of the buildings

 